State Route MO 3 S South
-
ADAIR COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins
MO 11 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 N North
-
ADAIR COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 01-NOV-2024.
Road work begins
.567 MILE(S) AFTER CRD BENTON RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 71 N North
-
ANDREW COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 02-APR-2024 to 30-AUG-2024.
Road work begins
.729 MILE(S) AFTER RP RTT TO US59N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:55 AM
and
09:00 PM.
US US 71 N North
-
ANDREW COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins
.177 MILE(S) BEFORE CRD 1382 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:00 AM
and
09:00 PM.
Interstate IS 29 N North
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
.043 MILE(S) AFTER RT W S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
Interstate IS 29 S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
1.942 MILE(S) BEFORE CRD C AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
US US 59 N North
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 19-APR-2024.
Road work begins
.004 MILE(S) AFTER CRD ATCHISON HOLT RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
US US 59 S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 19-APR-2024.
Road work begins
.838 MILE(S) BEFORE CRD 110 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route RT AA S South
-
AUDRAIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 03-MAY-2024.
Road work begins
RT BB E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT BB E East
-
AUDRAIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 26-APR-2024.
Road work begins
.001 MILE(S) BEFORE US 54 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT FF W West
-
AUDRAIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 30-APR-2024.
Road work begins
CST LIBERTY ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route MO 86 E East
-
BARRY COUNTY
- Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 30-MAY-2024.
Road work begins
.042 MILE(S) BEFORE MO 76 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT F E East
-
BARRY COUNTY
- Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 30-APR-2024.
Road work begins
MO 112 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT F W West
-
BARRY COUNTY
- Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 30-APR-2024.
Road work begins
MO 86 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 49 N North
-
BATES COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2024 to 30-JUL-2024.
Road work begins
.29 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done
7 days a week.
Interstate IS 49 N North
-
BATES COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins
.657 MILE(S) AFTER RP RTB TO IS49N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
BATES COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins
.311 MILE(S) AFTER RP RTA TO IS49S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
BATES COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2024 to 30-JUL-2024.
Road work begins
.309 MILE(S) BEFORE LP 49 S.
Work will be done
7 days a week.
Loop LP 49 N North
-
BATES COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins
IS 49 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Loop LP 49 S South
-
BATES COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins
.011 MILE(S) BEFORE CST CONKLIN ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 52 E East
-
BATES COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins
.527 MILE(S) AFTER CRD NW 2001 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 52 W West
-
BATES COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins
.043 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 51 N North
-
BOLLINGER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 31-MAY-2024.
Road work begins
.022 MILE(S) BEFORE MO 72 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT A W West
-
BOLLINGER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 04-MAR-2024 to 30-APR-2024.
Road work begins
.022 MILE(S) AFTER MO 51 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route RT B N North
-
BOLLINGER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 04-MAR-2024 to 30-APR-2024.
Road work begins
.026 MILE(S) BEFORE RT M E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route RT B S South
-
BOLLINGER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 04-MAR-2024 to 30-APR-2024.
Road work begins
MO 72 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Interstate IS 70 E East
-
BOONE COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 18-MAR-2024 to 03-MAY-2024.
Road work begins
.067 MILE(S) AFTER US 63C S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 70 W West
-
BOONE COUNTY
- Expect Delays
Project Name -
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-DEC-2024.
Road work begins
.169 MILE(S) BEFORE RP IS70W TO RTBB W.
Work will be done
on weekdays only.
State Route RT FF E East
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 30-APR-2024.
Road work begins
RT Z S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
US US 63 N North
-
BOONE COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 17-APR-2024 to 22-APR-2024.
Road work begins
.122 MILE(S) AFTER RP MO740 TO US63N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 63 S South
-
BOONE COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 17-APR-2024 to 22-APR-2024.
Road work begins
.264 MILE(S) BEFORE CST CLARK LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 124 E East
-
BOONE COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins
.01 MILE(S) AFTER CST STERLING BROCK DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 124 W West
-
BOONE COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins
.011 MILE(S) AFTER RT F S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT H W West
-
BOONE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-APR-2024 to 31-MAY-2024.
Road work begins
.003 MILE(S) AFTER CRD ENGLEWOOD RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT J N North
-
BOONE COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins
.043 MILE(S) BEFORE CST HARRIS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT J S South
-
BOONE COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins
.012 MILE(S) AFTER MO 124 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 371 S South
-
BUCHANAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins
.343 MILE(S) BEFORE CRD WILLIAMS RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT AC N North
-
BUCHANAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins
.005 MILE(S) AFTER RT YY E.
Work will be done
7 days a week.
State Route RT AC S South
-
BUCHANAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins
.007 MILE(S) AFTER CST FARAON ST E.
Work will be done
7 days a week.
US US 169 S South
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins
.028 MILE(S) AFTER RT FF S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT NN E East
-
BUCHANAN COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins
MO 31 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT Z N North
-
BUCHANAN COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins
.228 MILE(S) AFTER CRD COOK NE E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 13 N North
-
CALDWELL COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins
.032 MILE(S) AFTER CRD FAR WEST DR E.
Work will be done
7 days a week.
State Route MO 13 S South
-
CALDWELL COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins
.032 MILE(S) AFTER BU 36 E.
Work will be done
7 days a week.
Interstate IS 70 E East
-
CALLAWAY COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins
1.819 MILE(S) AFTER RP RTYY TO IS70E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 70 W West
-
CALLAWAY COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 18-MAR-2024 to 03-MAY-2024.
Road work begins
.04 MILE(S) BEFORE RP US54W TO IS70W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 94 E East
-
CALLAWAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 11-MAR-2024 to 26-APR-2024.
Road work begins
.018 MILE(S) BEFORE RP MO94E TO US54E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 94 W West
-
CALLAWAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 11-MAR-2024 to 26-APR-2024.
Road work begins
.219 MILE(S) AFTER CST COOPER DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT H E East
-
CALLAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-APR-2024 to 07-JUL-2024.
Road work begins
.023 MILE(S) AFTER BU 54 E.
Work will be done
7 days a week.
State Route RT H W West
-
CALLAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-APR-2024 to 07-JUL-2024.
Road work begins
.021 MILE(S) BEFORE US 54 E.
Work will be done
7 days a week.
State Route RT OO W West
-
CALLAWAY COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 19-APR-2024.
Road work begins
.078 MILE(S) BEFORE CST SPALDING RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 54 E East
-
CALLAWAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 12-MAR-2024 to 26-APR-2024.
Road work begins
.196 MILE(S) AFTER RR JEFFERSON CITY SUB E.
Work will be done
7 days a week.
US US 54 W West
-
CALLAWAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 12-MAR-2024 to 26-APR-2024.
Road work begins
.091 MILE(S) AFTER BK KATY TRAIL E.
Work will be done
7 days a week.
State Route RT EE N North
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
CRD GENES POINT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT EE S South
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT O N North
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
CRD TEER RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT O S South
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
US 54 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 25 N North
-
CAPE GIRARDEAU COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins
.002 MILE(S) AFTER CRD 203 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 25 S South
-
CAPE GIRARDEAU COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins
.008 MILE(S) AFTER CRD 325 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT K E East
-
CAPE GIRARDEAU COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins
MO 25 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT K W West
-
CAPE GIRARDEAU COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins
.004 MILE(S) BEFORE CRD 201 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 34 E East
-
CAPE GIRARDEAU COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 27-FEB-2024 to 28-FEB-2027.
Road work begins
.001 MILE(S) AFTER CRD 341 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 34 W West
-
CAPE GIRARDEAU COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 27-FEB-2024 to 28-FEB-2027.
Road work begins
MO 72 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 41 N North
-
CARROLL COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins
.187 MILE(S) AFTER RT F E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 41 S South
-
CARROLL COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins
US 24 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CRD PECULIAR DR N North
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins
.015 MILE(S) BEFORE CST CUNNINGHAM INDUSTRIAL PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CRD PECULIAR DR S South
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins
CST CUNNINGHAM INDUSTRIAL PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 2 W West
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 05-APR-2024 to 19-APR-2024.
Road work begins
.031 MILE(S) AFTER CST KING AVE S.
Work will be done
7 days a week.
Work will be conducted between the hours of
10:00 AM
and
03:00 PM.
State Route RT A W West
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins
.375 MILE(S) BEFORE CRD NELSON RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT K N North
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 18-APR-2024 to 25-APR-2024.
Road work begins
.466 MILE(S) AFTER CRD E 245TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT P E East
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 19-APR-2024.
Road work begins
.119 MILE(S) BEFORE CRD PURVIS RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
07:00 PM.
State Route RT P W West
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 19-APR-2024.
Road work begins
.104 MILE(S) AFTER CRD PURVIS RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
07:00 PM.
State Route MO 11 N North
-
CHARITON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
.358 MILE(S) AFTER US 24 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 129 N North
-
CHARITON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins
.002 MILE(S) AFTER CRD MENEFEE RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 5 N North
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins
.08 MILE(S) BEFORE CST MISSOURI ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 5 N North
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins
.108 MILE(S) AFTER RT KK S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route MO 5 S South
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins
.023 MILE(S) BEFORE CO US24 TO MO5 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
CRD KASTENDIECK RD E East
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-FEB-2024 to 05-MAY-2024.
Road work begins
.006 MILE(S) AFTER CRD ALOE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CRD KASTENDIECK RD W West
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-FEB-2024 to 05-MAY-2024.
Road work begins
CRD VERMULE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CRD VERMULE RD N North
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-MAR-2024 to 05-MAY-2024.
Road work begins
CRD KASTENDIECK RD E.
Work will be done
7 days a week.
CRD VERMULE RD N North
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-FEB-2024 to 05-MAY-2024.
Road work begins
CRD KASTENDIECK RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CRD VERMULE RD S South
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-FEB-2024 to 05-MAY-2024.
Road work begins
MO 14 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CRD VERMULE RD S South
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-MAR-2024 to 05-MAY-2024.
Road work begins
.02 MILE(S) AFTER MO 14 E.
Work will be done
7 days a week.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 31-MAY-2024.
Road work begins
.01 MILE(S) BEFORE CST MAIN ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 19-FEB-2024 to 03-JUN-2024.
Road work begins
.007 MILE(S) BEFORE CST N CHEROKEE TRL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 14 W West
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 31-MAY-2024.
Road work begins
.028 MILE(S) AFTER CRD S 32ND ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
PVT ENGLISH VILLAGE DR E East
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins
.002 MILE(S) AFTER CRD N DEFFER DR S.
Work will be done
on weekdays only.
PVT ENGLISH VILLAGE DR W West
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins
US 160 E.
Work will be done
on weekdays only.
State Route RT AA E East
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins
.002 MILE(S) AFTER PVT BRISTOL LN S.
Work will be done
on weekdays only.
State Route RT AA W West
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins
.001 MILE(S) BEFORE US 160 E.
Work will be done
on weekdays only.
State Route RT CC E East
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins
US 160 E.
Work will be done
on weekdays only.
State Route RT CC E East
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2024 to 26-APR-2024.
Road work begins
US 160 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
State Route RT CC W West
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins
.002 MILE(S) AFTER CRD SYCAMORE RD E.
Work will be done
on weekdays only.
State Route RT CC W West
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2024 to 26-APR-2024.
Road work begins
.017 MILE(S) AFTER CRD SYCAMORE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
State Route RT K S South
-
CHRISTIAN COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 19-FEB-2024 to 03-JUN-2024.
Road work begins
.004 MILE(S) AFTER MO 14 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT P N North
-
CHRISTIAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-APR-2024 to 03-MAY-2024.
Road work begins
.001 MILE(S) AFTER MO 14 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route RT V W West
-
CHRISTIAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins
US 160 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 160 W West
-
CHRISTIAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 28-MAR-2024 to 26-APR-2024.
Road work begins
.081 MILE(S) BEFORE CST ALDERSGATE DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
US US 60 E East
-
CHRISTIAN COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-FEB-2024 to 29-MAY-2024.
Road work begins
CST HOWCRAFT AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 E East
-
CHRISTIAN COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 27-FEB-2024 to 05-MAY-2024.
Road work begins
CRD LAMBETH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 W West
-
CHRISTIAN COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-FEB-2024 to 29-MAY-2024.
Road work begins
.042 MILE(S) AFTER CST PLYMOUTH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 W West
-
CHRISTIAN COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 27-FEB-2024 to 05-MAY-2024.
Road work begins
.001 MILE(S) AFTER MO 14 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 W West
-
CHRISTIAN COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 06-MAR-2024 to 05-MAY-2024.
Road work begins
.001 MILE(S) AFTER CRD STAIGER RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 W West
-
CHRISTIAN COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins
CRD LAMBETH RD S.
Work will be done
on weekdays only.
US US 65 N North
-
CHRISTIAN COUNTY
- Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins
.009 MILE(S) AFTER RT F W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
US US 65 N North
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins
.023 MILE(S) BEFORE RT F E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
US US 65 S South
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins
.011 MILE(S) BEFORE RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
US US 65 S South
-
CHRISTIAN COUNTY
- Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins
.115 MILE(S) BEFORE RP US65S TO MO14 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
US US 160 W West
-
CHRISTIAN COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins
.147 MILE(S) BEFORE RT AA E.
Work will be done
7 days a week.
State Route RT C E East
-
CLARK COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 17-APR-2024 to 01-JUL-2024.
Road work begins
MO 81 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT C W West
-
CLARK COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 17-APR-2024 to 01-JUL-2024.
Road work begins
.01 MILE(S) AFTER MO 27 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT D E East
-
CLARK COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-APR-2024 to 31-MAY-2024.
Road work begins
.187 MILE(S) AFTER CRD 391 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT D W West
-
CLARK COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-APR-2024 to 31-MAY-2024.
Road work begins
.236 MILE(S) BEFORE CRD 391 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT D E East
-
CLARK COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins
.533 MILE(S) BEFORE RT W E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT D W West
-
CLARK COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins
.51 MILE(S) AFTER RT W E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 169 N North
-
CLAY COUNTY
- Expect Delays
CONCRETE BARRIER WALL
Scheduled from 16-APR-2024 to 07-JUN-2024.
Road work begins
.284 MILE(S) BEFORE RR FORT SCOTT SUB S.
Work will be done
7 days a week.
US US 169 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins
.013 MILE(S) BEFORE CRD CLINTON COUNTY LINE RD E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CST N OAK TRFY S South
-
CLAY COUNTY
- Delays Possible
Project Name -
BLUME
PERMIT OR UTILITY WORK
Scheduled from 18-MAR-2024 to 30-SEP-2024.
Road work begins
.05 MILE(S) BEFORE MO 9 N.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
CST NW BARRY RD W West
-
CLAY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2024.
Road work begins
.025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done
7 days a week.
State Route MO 1 N North
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.046 MILE(S) AFTER CST 64TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 1 S South
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 05-APR-2024 to 26-APR-2024.
Road work begins
.406 MILE(S) AFTER CST NE 80TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
US US 169 N North
-
CLAY COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 12-JUL-2024.
Road work begins
.049 MILE(S) AFTER CST ROCK CREEK TER E.
Work will be done
7 days a week.
US US 169 S South
-
CLAY COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 12-JUL-2024.
Road work begins
.378 MILE(S) AFTER CST LAKE MEADOWS DR E.
Work will be done
7 days a week.
US US 169 S South
-
CLAY COUNTY
- Delays Possible
CONCRETE BARRIER WALL
Scheduled from 16-APR-2024 to 07-JUN-2024.
Road work begins
.045 MILE(S) BEFORE CST NW BRIARCLIFF PKWY W.
Work will be done
7 days a week.
US US 69 N North
-
CLAY COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.079 MILE(S) BEFORE CST PARK AVE E.
Work will be done
on weekdays only.
US US 69 S South
-
CLAY COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.019 MILE(S) BEFORE CST RANDOLPH RD S.
Work will be done
on weekdays only.
Interstate IS 35 N North
-
CLINTON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins
.814 MILE(S) BEFORE RT H E.
Work will be done
on weekdays and Saturdays.
Interstate IS 35 S South
-
CLINTON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins
.686 MILE(S) BEFORE RT H E.
Work will be done
on weekdays and Saturdays.
Business BU 50 E East
-
COLE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2024 to 24-MAY-2024.
Road work begins
.147 MILE(S) BEFORE CST HEISINGER RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Business BU 50 W West
-
COLE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2024 to 24-MAY-2024.
Road work begins
.018 MILE(S) BEFORE CST SOUTHWEST BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST MISSOURI BLVD E East
-
COLE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2024 to 24-MAY-2024.
Road work begins
.016 MILE(S) BEFORE CST KANSAS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST W EDGEWOOD DR W West
-
COLE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2024 to 24-MAY-2024.
Road work begins
.072 MILE(S) BEFORE MO 179 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT A W West
-
COLE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 25-APR-2024.
Road work begins
.085 MILE(S) AFTER RT FF S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
03:00 PM.
State Route RT N W West
-
COLE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
MO 179 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
02:00 PM.
Interstate IS 70 E East
-
COOPER COUNTY
- Expect Delays
Project Name -
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-DEC-2024.
Road work begins
.027 MILE(S) AFTER RR RIVER SUB E.
Work will be done
on weekdays only.
Interstate IS 44 E East
-
CRAWFORD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 20-JUL-2024.
Road work begins
.393 MILE(S) BEFORE CRD BEAMER LN S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Outer Road N OR 44 E East
-
CRAWFORD COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.01 MILE(S) BEFORE CRD FRONTAGE RD E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT EE N North
-
CRAWFORD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-APR-2024 to 10-MAY-2024.
Road work begins
.018 MILE(S) AFTER RT F S.
Work will be done
on weekdays only.
State Route MO 19 N North
-
CRAWFORD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 25-APR-2024.
Road work begins
.001 MILE(S) AFTER CST GRAND DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 19 N North
-
CRAWFORD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
.009 MILE(S) BEFORE CRD WINKLEMANN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 19 S South
-
CRAWFORD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
.061 MILE(S) AFTER CST OLD CUBA RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 19 S South
-
CRAWFORD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 25-APR-2024.
Road work begins
.002 MILE(S) BEFORE CRD MCCORMICK RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 8 E East
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 01-APR-2024 to 25-APR-2024.
Road work begins
.01 MILE(S) AFTER CRD BUTTS RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 8 W West
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 01-APR-2024 to 25-APR-2024.
Road work begins
.034 MILE(S) BEFORE RT Y S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT M N North
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
.468 MILE(S) BEFORE CRD WESCO CEMERTRY RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT M S South
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
.268 MILE(S) AFTER MO 8 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT VV N North
-
CRAWFORD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
MO 19 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT VV S South
-
CRAWFORD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
Interstate IS 44 W West
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 20-JUL-2024.
Road work begins
.315 MILE(S) AFTER MO 185 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Outer Road N OR 44 E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.156 MILE(S) BEFORE CST WILDWOOD TERRACE S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road N OR 44 E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
RT WW E.
Work will be done
on weekdays only.
Outer Road N OR 44 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.005 MILE(S) AFTER MO 47 S.
Work will be done
on weekdays only.
Outer Road N OR 44 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.157 MILE(S) AFTER CST WILDWOOD TERRACE S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road N OR 44 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
RT WW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road S OR 44 E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
RT WW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road S OR 44 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
MO 185 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 100 E East
-
FRANKLIN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.064 MILE(S) AFTER CST BEDFORD CENTER DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 100 W West
-
FRANKLIN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.182 MILE(S) BEFORE CST FIFTH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 185 N North
-
FRANKLIN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.018 MILE(S) BEFORE RT WW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 185 S South
-
FRANKLIN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.023 MILE(S) BEFORE RT WW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E E East
-
FRANKLIN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 19-APR-2024.
Road work begins
.245 MILE(S) BEFORE CRD HORSTMAN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E W West
-
FRANKLIN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 19-APR-2024.
Road work begins
MO 100 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT HH N North
-
FRANKLIN COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 30-APR-2024.
Road work begins
MO 30 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT HH S South
-
FRANKLIN COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 30-APR-2024.
Road work begins
RT O E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT WW E East
-
FRANKLIN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.001 MILE(S) BEFORE RT D S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT WW W West
-
FRANKLIN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
MO 185 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 100 W West
-
GASCONADE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins
.015 MILE(S) BEFORE RT N S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 19 N North
-
GASCONADE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 28-JUN-2024.
Road work begins
.017 MILE(S) AFTER MO 100 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route MO 28 E East
-
GASCONADE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 08-APR-2024 to 29-APR-2024.
Road work begins
.013 MILE(S) BEFORE RT EE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 28 W West
-
GASCONADE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 10-MAY-2024.
Road work begins
.061 MILE(S) AFTER RT EE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route MO 28 W West
-
GASCONADE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 08-APR-2024 to 29-APR-2024.
Road work begins
.238 MILE(S) AFTER US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT EE S South
-
GASCONADE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-APR-2024 to 10-MAY-2024.
Road work begins
.006 MILE(S) AFTER MO 28 E.
Work will be done
on weekdays only.
State Route RT U W West
-
GASCONADE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
RT B S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
03:30 PM.
CST GLENSTONE AVE N North
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2023 to 28-JUN-2024.
Road work begins
.002 MILE(S) BEFORE CST REPUBLIC CT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST GLENSTONE AVE S South
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2023 to 28-JUN-2024.
Road work begins
.003 MILE(S) AFTER RP IS44E TO LP44W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 125 N North
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins
.004 MILE(S) AFTER CRD 186 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 125 S South
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins
.044 MILE(S) AFTER CRD 170 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 125 S South
-
GREENE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-MAR-2024 to 26-APR-2024.
Road work begins
.051 MILE(S) BEFORE OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 13 N North
-
GREENE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-MAR-2024 to 19-APR-2024.
Road work begins
.012 MILE(S) AFTER CRD 157 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 13 N North
-
GREENE COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins
.021 MILE(S) BEFORE RP US60W TO MO13S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 13 N North
-
GREENE COUNTY
- Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 01-MAY-2024.
Road work begins
.001 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 13 S South
-
GREENE COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins
.229 MILE(S) BEFORE OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Outer Road S OR 60 E East
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-DEC-2023 to 15-MAY-2024.
Road work begins
.005 MILE(S) AFTER CST S NATURE CENTER WAY W.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Outer Road S OR 60 W West
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-DEC-2023 to 15-MAY-2024.
Road work begins
CST S NATURE CENTER WAY E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT NN N North
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 01-JUN-2024.
Road work begins
.001 MILE(S) BEFORE US 60 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT NN S South
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 01-JUN-2024.
Road work begins
.005 MILE(S) BEFORE US 60 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT P S South
-
GREENE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-APR-2024 to 03-MAY-2024.
Road work begins
US 60 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route RT ZZ N North
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins
.005 MILE(S) AFTER CRD 186 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT ZZ S South
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins
.01 MILE(S) AFTER CST HINES ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins
.218 MILE(S) BEFORE RP US60E TO KANSAS EXPY S S.
Work will be done
7 days a week.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 28-MAR-2024 to 26-APR-2024.
Road work begins
.023 MILE(S) AFTER CO US160 TO PVT PRIVATE DR W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
US US 160 W West
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins
.087 MILE(S) AFTER US 60 W.
Work will be done
7 days a week.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins
.073 MILE(S) BEFORE US 160 E.
Work will be done
7 days a week.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 01-JUN-2024.
Road work begins
.04 MILE(S) AFTER RP US60E TO RTNN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins
.013 MILE(S) AFTER CRD 205 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins
.012 MILE(S) BEFORE RT B S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 09-APR-2024 to 23-MAY-2024.
Road work begins
.049 MILE(S) BEFORE RT NN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 01-JUN-2024.
Road work begins
.04 MILE(S) AFTER RP US60W TO RTJ N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins
.086 MILE(S) BEFORE RP BU65 TO US60W W.
Work will be done
7 days a week.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins
.001 MILE(S) AFTER CST ILLINOIS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 65 N North
-
GREENE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 18-MAR-2024 to 01-MAY-2024.
Road work begins
.111 MILE(S) BEFORE RP IS44W TO US65N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 160 E East
-
GREENE COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins
.014 MILE(S) AFTER CRD 182 E.
Work will be done
7 days a week.
Interstate IS 35 N North
-
HARRISON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.065 MILE(S) BEFORE US 136 E.
Work will be done
on weekdays only.
Interstate IS 35 S South
-
HARRISON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.047 MILE(S) BEFORE RT N E.
Work will be done
on weekdays only.
State Route MO 13 S South
-
HENRY COUNTY
- Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 01-MAY-2024.
Road work begins
MO 7 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 2 W West
-
HENRY COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins
.405 MILE(S) AFTER RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route MO 5 N North
-
HOWARD COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2024 to 26-APR-2024.
Road work begins
.023 MILE(S) BEFORE CST HERNDON ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route MO 5 S South
-
HOWARD COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2024 to 26-APR-2024.
Road work begins
.024 MILE(S) BEFORE MO 240 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route MO 3 N North
-
HOWARD COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins
.028 MILE(S) BEFORE CST SEMINARY ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route MO 3 S South
-
HOWARD COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins
.138 MILE(S) AFTER CST CENTRAL ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route RT V E East
-
HOWARD COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins
.014 MILE(S) BEFORE MO 3 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route RT Z E East
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-APR-2024 to 25-APR-2024.
Road work begins
RT J E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT Z W West
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-APR-2024 to 25-APR-2024.
Road work begins
MO 87 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 160 E East
-
HOWELL COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 05-FEB-2024 to 01-OCT-2024.
Road work begins
.017 MILE(S) BEFORE RT BB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 160 E East
-
HOWELL COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-OCT-2023 to 01-OCT-2024.
Road work begins
.019 MILE(S) AFTER US 63 N.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 160 W West
-
HOWELL COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 05-FEB-2024 to 01-OCT-2024.
Road work begins
.003 MILE(S) BEFORE CRD 2730 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 N North
-
HOWELL COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-MAY-2023 to 24-OCT-2024.
Road work begins
.052 MILE(S) BEFORE RR THAYER NORTH SUB E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
HOWELL COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-MAY-2023 to 24-OCT-2024.
Road work begins
.022 MILE(S) AFTER CRD 9020 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
HOWELL COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 04-MAR-2024 to 28-JUN-2024.
Road work begins
.003 MILE(S) BEFORE BU 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 221 N North
-
IRON COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins
.006 MILE(S) BEFORE RR DESOTO SUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 221 S South
-
IRON COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins
.001 MILE(S) AFTER CRD 97 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 49 N North
-
IRON COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins
.006 MILE(S) AFTER CRD 68 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 49 S South
-
IRON COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins
.003 MILE(S) BEFORE CRD 3 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 32 E East
-
IRON COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.009 MILE(S) AFTER RT KK S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 32 W West
-
IRON COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.154 MILE(S) AFTER RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT KK S South
-
IRON COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-FEB-2024 to 30-JUL-2024.
Road work begins
MO 32 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT N S South
-
IRON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road work begins
MO 21 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST E 6TH ST E East
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 17-APR-2024 to 30-APR-2024.
Road work begins
CST W 6TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CST NE RICE RD N North
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 31-JAN-2024 to 24-APR-2024.
Road work begins
CST SE LANGSFORD RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
CST NE RICE RD S South
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 31-JAN-2024 to 24-APR-2024.
Road work begins
.006 MILE(S) AFTER CST NE COLUMBUS ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 435 N North
-
JACKSON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 10-APR-2024 to 24-APR-2024.
Road work begins
.158 MILE(S) BEFORE RP IS435N TO LANCER LN E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 435 S South
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-APR-2024 to 28-APR-2024.
Road work begins
.031 MILE(S) AFTER RP IS435S TO FRONT ST E E.
Work will be done
7 days a week.
Interstate IS 70 E East
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-MAR-2024 to 15-MAY-2024.
Road work begins
.026 MILE(S) AFTER US 71 S.
Work will be done
7 days a week.
State Route MO 350 E East
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JAN-2024 to 31-MAY-2024.
Road work begins
.046 MILE(S) BEFORE RT V S.
Work will be done
7 days a week.
State Route MO 350 W West
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JAN-2024 to 31-MAY-2024.
Road work begins
.028 MILE(S) AFTER CST BLUE PKWY E.
Work will be done
7 days a week.
Ramp RP IS435N TO STADIUM DR E East
-
JACKSON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 10-APR-2024 to 24-APR-2024.
Road work begins
IS 435 N.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP IS670E TO IS70W W West
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 26-JUL-2023 to 31-MAY-2024.
Road work begins
IS 670 E.
Work will be done
7 days a week.
US US 24 E East
-
JACKSON COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 16-APR-2024 to 24-APR-2024.
Road work begins
.228 MILE(S) BEFORE CST ELSEA SMITH RD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CST CLEAVER II BLVD E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins
.002 MILE(S) AFTER CST E 46TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST CLEAVER II BLVD W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins
.02 MILE(S) AFTER CST OLIVE ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST E 22ND ST E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.015 MILE(S) AFTER CST CAMPBELL ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST E 22ND ST W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.006 MILE(S) BEFORE CST TRACY AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST E 39TH ST E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.016 MILE(S) BEFORE CST HIGHLAND AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST E 39TH ST W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.033 MILE(S) AFTER CST BROOKLYN AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST MICHIGAN AVE S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.002 MILE(S) BEFORE RP US71S TO MICHIGAN AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST TRUMAN RD E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-MAR-2024 to 26-APR-2024.
Road work begins
.023 MILE(S) AFTER CST CUNNINGHAM S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
12:00 PM.
CST TRUMAN RD W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-FEB-2024 to 26-APR-2024.
Road work begins
.005 MILE(S) AFTER CST CRYSLER AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 78 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins
.022 MILE(S) BEFORE CST CRESCENT AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 78 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins
.051 MILE(S) AFTER CST RALSTON AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP DR MARTIN LUTHER KING JR BLVD TO US71N N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins
.005 MILE(S) AFTER CST DR MARTIN LUTHER KING JR BLVD W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP US71N TO 22ND ST E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
US 71 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP US71N TO E 39TH ST N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.094 MILE(S) AFTER US 71 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP US71S TO DR MARTIN LUTHER KING JR BLVD E E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins
.011 MILE(S) BEFORE CST MICHIGAN AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP US71S TO EMANUEL CLEAVER II BLVD S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins
US 71 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP US71S TO THE PASEO S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.011 MILE(S) AFTER US 71 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
.012 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done
7 days a week.
US US 24 W West
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
OR 291 S.
Work will be done
7 days a week.
State Route RT HH E East
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-APR-2024 to 30-APR-2024.
Road work begins
CST MAIN ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT HH W West
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-APR-2024 to 30-APR-2024.
Road work begins
.028 MILE(S) AFTER OR 171 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 171 N North
-
JASPER COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 03-APR-2024 to 30-APR-2024.
Road work begins
.017 MILE(S) BEFORE RT HH E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
Loop LP 44 E East
-
JASPER COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 26-APR-2024.
Road work begins
.053 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Loop LP 44 W West
-
JASPER COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 26-APR-2024.
Road work begins
.002 MILE(S) AFTER RT U S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 55 N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins
.208 MILE(S) BEFORE US 61 S.
Work will be done
7 days a week.
Interstate IS 55 S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-MAR-2024 to 15-APR-2025.
Road work begins
.046 MILE(S) AFTER RP SP61E TO IS55S S.
Work will be done
7 days a week.
State Route MO 141 N North
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-APR-2024 to 23-APR-2024.
Road work begins
.094 MILE(S) AFTER CRD FIEDLER LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 141 S South
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-APR-2024 to 23-APR-2024.
Road work begins
.234 MILE(S) BEFORE CRD FIEDLER LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 21 N North
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-FEB-2024 to 01-NOV-2024.
Road work begins
.039 MILE(S) BEFORE CRD OLD HWY 21 S.
Work will be done
7 days a week.
State Route MO 21 S South
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-SEP-2023 to 28-JUN-2024.
Road work begins
.051 MILE(S) AFTER CRD TESSON FERRY RD S.
Work will be done
7 days a week.
Ramp RP IS55N TO US67N N North
-
JEFFERSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins
.013 MILE(S) AFTER IS 55 N.
Work will be done
on weekdays only.
Ramp RP IS55S TO US67S S South
-
JEFFERSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins
.005 MILE(S) AFTER IS 55 S.
Work will be done
on weekdays only.
Ramp RP US67N TO IS55N N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins
US 67 N.
Work will be done
on weekdays only.
Ramp RP US67S TO IS55S S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins
US 67 S.
Work will be done
on weekdays only.
US US 67 N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins
.091 MILE(S) BEFORE RP US67N TO IS55S S.
Work will be done
on weekdays only.
US US 67 S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins
.027 MILE(S) BEFORE RP US67S TO IS55N N.
Work will be done
on weekdays only.
State Route MO 2 E East
-
JOHNSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins
.217 MILE(S) BEFORE CRD 1931 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route RT Y E East
-
JOHNSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins
MO 13 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route RT Y W West
-
JOHNSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins
.118 MILE(S) AFTER CRD 475 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
US US 50 E East
-
JOHNSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 14-JUN-2024.
Road work begins
.019 MILE(S) AFTER RP MO23 TO US50E E.
Work will be done
7 days a week.
US US 50 W West
-
JOHNSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 14-JUN-2024.
Road work begins
.456 MILE(S) BEFORE RT D S.
Work will be done
7 days a week.
US US 50 W West
-
JOHNSON COUNTY
- Delays Possible
MEDIAN OR SHOULDER
Scheduled from 17-APR-2024 to 19-APR-2024.
Road work begins
.006 MILE(S) BEFORE OR 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT E N North
-
KNOX COUNTY
- Expect Delays
Project Name -
25 bridge rehab
BRIDGE MAINTENANCE
Scheduled from 28-FEB-2024 to 30-AUG-2024.
Road work begins
.011 MILE(S) AFTER CRD TRUMAN LP S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT E S South
-
KNOX COUNTY
- Expect Delays
Project Name -
25 bridge rehab
BRIDGE MAINTENANCE
Scheduled from 28-FEB-2024 to 30-AUG-2024.
Road work begins
.045 MILE(S) BEFORE CRD TRUMAN LP S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT M N North
-
KNOX COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 30-APR-2024.
Road work begins
.172 MILE(S) AFTER CO RTM TO MCQUIODS MILL PL S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT M S South
-
KNOX COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 30-APR-2024.
Road work begins
.226 MILE(S) BEFORE CO RTM TO MCQUIODS MILL PL S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT M N North
-
KNOX COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins
.172 MILE(S) AFTER CO RTM TO MCQUIODS MILL PL S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT M S South
-
KNOX COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins
.226 MILE(S) BEFORE CO RTM TO MCQUIODS MILL PL S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 44 E East
-
LACLEDE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-SEP-2023 to 30-APR-2024.
Road work begins
1.289 MILE(S) AFTER RP RTN TO IS44E E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
07:00 AM.
State Route RT BB N North
-
LACLEDE COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-MAR-2024 to 30-APR-2024.
Road work begins
.007 MILE(S) AFTER CRD PRAIRIE CREEK DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT BB S South
-
LACLEDE COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-MAR-2024 to 30-APR-2024.
Road work begins
.052 MILE(S) BEFORE CRD PRESLEY LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT F N North
-
LACLEDE COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-MAR-2024 to 10-MAY-2024.
Road work begins
.474 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT F S South
-
LACLEDE COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-MAR-2024 to 10-MAY-2024.
Road work begins
.124 MILE(S) BEFORE CRD RILEY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT M S South
-
LAFAYETTE COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 03-MAY-2024.
Road work begins
.431 MILE(S) AFTER CRD MOUNT ZION RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 213 N North
-
LAFAYETTE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-APR-2024 to 22-APR-2024.
Road work begins
MO 20 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 213 S South
-
LAFAYETTE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-APR-2024 to 22-APR-2024.
Road work begins
.035 MILE(S) AFTER US 24 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
CST ODELL ST E East
-
LAWRENCE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-MAY-2024.
Road work begins
.001 MILE(S) AFTER CST ASH ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CST ODELL ST W West
-
LAWRENCE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-MAY-2024.
Road work begins
.002 MILE(S) AFTER CST FRISCO ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 44 E East
-
LAWRENCE COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 26-NOV-2023 to 21-JUN-2024.
Road work begins
.732 MILE(S) AFTER RT F E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Interstate IS 44 W West
-
LAWRENCE COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 26-NOV-2023 to 21-JUN-2024.
Road work begins
.075 MILE(S) AFTER RT H S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route MO 37 N North
-
LAWRENCE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-OCT-2023 to 01-MAY-2024.
Road work begins
.004 MILE(S) AFTER CST MYRTLE ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 37 S South
-
LAWRENCE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-OCT-2023 to 01-MAY-2024.
Road work begins
.043 MILE(S) AFTER RR UNKNOWN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 97 N North
-
LAWRENCE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-OCT-2023 to 03-MAY-2024.
Road work begins
.003 MILE(S) AFTER MO 37 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 97 S South
-
LAWRENCE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-OCT-2023 to 03-MAY-2024.
Road work begins
.037 MILE(S) BEFORE CST MADISON ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT H N North
-
LAWRENCE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins
.031 MILE(S) BEFORE CST 1ST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT H S South
-
LAWRENCE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins
.096 MILE(S) BEFORE CST 5TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT ZZ E East
-
LAWRENCE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-APR-2024 to 10-MAY-2024.
Road work begins
CST MISSOURI AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT ZZ W West
-
LAWRENCE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-APR-2024 to 10-MAY-2024.
Road work begins
CST CENTRAL AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 E East
-
LAWRENCE COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 06-MAR-2024 to 05-MAY-2024.
Road work begins
.001 MILE(S) AFTER MO 14 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 E East
-
LAWRENCE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
.027 MILE(S) AFTER BU 60 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
US US 60 W West
-
LAWRENCE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
.006 MILE(S) BEFORE CRD 2210 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 5 S South
-
LINN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins
.011 MILE(S) AFTER RT U S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT D N North
-
LIVINGSTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins
.112 MILE(S) BEFORE CST MAIN ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT D S South
-
LIVINGSTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins
.015 MILE(S) BEFORE CST MAIN ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT DD E East
-
LIVINGSTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins
.03 MILE(S) BEFORE CST 4TH ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
06:00 PM.
State Route RT DD W West
-
LIVINGSTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins
.006 MILE(S) AFTER RT D S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
06:00 PM.
US US 36 E East
-
LIVINGSTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins
.031 MILE(S) AFTER RP US36E TO US65 E.
Work will be done
7 days a week.
US US 36 E East
-
LIVINGSTON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins
.007 MILE(S) AFTER CRD 401 S.
Work will be done
7 days a week.
US US 36 W West
-
LIVINGSTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins
.07 MILE(S) AFTER BU 36 E.
Work will be done
7 days a week.
US US 36 W West
-
LIVINGSTON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins
.066 MILE(S) BEFORE BU 36 E.
Work will be done
7 days a week.
State Route MO 129 S South
-
MACON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins
.018 MILE(S) AFTER US 36 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT K E East
-
MADISON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 26-APR-2024.
Road work begins
MO 72 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT K W West
-
MADISON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 26-APR-2024.
Road work begins
RT H S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT A E East
-
MADISON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 04-MAR-2024 to 30-APR-2024.
Road work begins
.028 MILE(S) BEFORE RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route MO 28 E East
-
MARIES COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 10-MAY-2024.
Road work begins
.05 MILE(S) AFTER US 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route RT BB W West
-
MARIES COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-MAR-2024 to 30-APR-2024.
Road work begins
MO 133 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route MO 28 E East
-
MARIES COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2024 to 25-APR-2024.
Road work begins
.455 MILE(S) BEFORE RT W E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT AA N North
-
MARIES COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2024 to 25-APR-2024.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT U E East
-
MARIES COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
.011 MILE(S) AFTER CO RTU TO RTH W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
03:30 PM.
State Route MO 79 N North
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins
CST LYON ST E.
Work will be done
on weekdays only.
State Route MO 79 S South
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins
.001 MILE(S) AFTER CST GRAND AVE S.
Work will be done
on weekdays only.
State Route RT BB E East
-
MILLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-MAR-2024 to 30-APR-2024.
Road work begins
MO 42 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route RT F E East
-
MILLER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
CRD PEA RIDGE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT F W West
-
MILLER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
MO 17 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT HH N North
-
MILLER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
.05 MILE(S) AFTER CRD BROCKMAN SPRINGS RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT HH S South
-
MILLER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
MO 52 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT JJ E East
-
MILLER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
CRD PEA RIDGE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT JJ W West
-
MILLER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
RT C S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
Interstate IS 57 N North
-
MISSISSIPPI COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-FEB-2024 to 01-JUL-2024.
Road work begins
.134 MILE(S) BEFORE RT UU S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Interstate IS 57 N North
-
MISSISSIPPI COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-APR-2024 to 23-APR-2024.
Road work begins
.369 MILE(S) AFTER RA IS57N CHARLESTON N.
Work will be done
on weekdays only.
Interstate IS 57 S South
-
MISSISSIPPI COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-FEB-2024 to 01-JUL-2024.
Road work begins
.657 MILE(S) AFTER CRD 218 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
US US 62 E East
-
MISSISSIPPI COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 21-AUG-2023 to 01-AUG-2024.
Road work begins
.003 MILE(S) AFTER CST S GILMORE AVE S.
Work will be done
on weekdays only.
US US 62 W West
-
MISSISSIPPI COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 21-AUG-2023 to 01-AUG-2024.
Road work begins
.003 MILE(S) BEFORE OR 57 S.
Work will be done
on weekdays only.
State Route MO 87 N North
-
MONITEAU COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2024 to 26-APR-2024.
Road work begins
.035 MILE(S) AFTER CST LAKE ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route MO 87 S South
-
MONITEAU COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2024 to 26-APR-2024.
Road work begins
.021 MILE(S) BEFORE BU 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route RT A E East
-
MONITEAU COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 25-APR-2024.
Road work begins
MO 87 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
03:00 PM.
State Route RT N E East
-
MONITEAU COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins
MO 87 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
02:00 PM.
State Route MO 19 S South
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 28-JUN-2024.
Road work begins
.027 MILE(S) AFTER MO 94 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route RT A E East
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 19-APR-2024.
Road work begins
MO 19 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT A W West
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 19-APR-2024.
Road work begins
MO 161 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT AA N North
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 03-MAY-2024.
Road work begins
MO 19 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT BB W West
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 26-APR-2024.
Road work begins
RT AC S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 135 N North
-
MORGAN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 26-APR-2024.
Road work begins
.006 MILE(S) BEFORE CST FIRST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 135 S South
-
MORGAN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 26-APR-2024.
Road work begins
.02 MILE(S) BEFORE MO 52 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 162 E East
-
NEW MADRID COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 15-APR-2024 to 20-MAY-2024.
Road work begins
.013 MILE(S) AFTER CRD 263 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 E East
-
NEW MADRID COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-OCT-2023 to 01-JUL-2024.
Road work begins
.011 MILE(S) AFTER US 62 E.
Work will be done
on weekdays only.
State Route MO 86 E East
-
NEWTON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 18-MAR-2024 to 24-JUN-2024.
Road work begins
.001 MILE(S) AFTER CRD IBEX RD S.
Work will be done
on weekdays only.
State Route MO 86 E East
-
NEWTON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-JAN-2024 to 24-JUN-2024.
Road work begins
.006 MILE(S) AFTER CRD IBEX RD S.
Work will be done
7 days a week.
State Route MO 86 W West
-
NEWTON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-JAN-2024 to 24-JUN-2024.
Road work begins
.014 MILE(S) AFTER MO 175 S.
Work will be done
on weekdays only.
State Route MO 86 W West
-
NEWTON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 22-JAN-2024 to 24-JUN-2024.
Road work begins
.004 MILE(S) AFTER MO 175 S.
Work will be done
on weekdays only.
State Route MO 86 W West
-
NEWTON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 15-JAN-2024 to 24-JUN-2024.
Road work begins
.02 MILE(S) AFTER MO 175 S.
Work will be done
on weekdays only.
State Route MO 86 W West
-
NEWTON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 18-MAR-2024 to 24-JUN-2024.
Road work begins
MO 175 S.
Work will be done
on weekdays only.
CRD HAMMER RD N North
-
NEWTON COUNTY
- No Expected Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-JAN-2024 to 24-JUN-2024.
Road work begins
MO 86 E.
Work will be done
on weekdays only.
CRD HAMMER RD S South
-
NEWTON COUNTY
- No Expected Delays
INTERSECTION IMPROVEMENTS
Scheduled from 11-MAR-2024 to 24-JUN-2024.
Road work begins
.071 MILE(S) BEFORE MO 86 E.
Work will be done
on weekdays only.
State Route RT NN E East
-
NODAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 24-APR-2024.
Road work begins
.452 MILE(S) AFTER CRD ORION RD S.
Work will be done
on weekdays only.
State Route RT NN W West
-
NODAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 24-APR-2024.
Road work begins
.002 MILE(S) AFTER CRD PANTHER RD S.
Work will be done
on weekdays only.
US US 71 S South
-
NODAWAY COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins
.17 MILE(S) BEFORE RT V E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:00 AM
and
09:00 PM.
US US 160 W West
-
OREGON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-OCT-2023 to 01-OCT-2024.
Road work begins
.019 MILE(S) AFTER MO 99 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 63 N North
-
OREGON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-MAR-2024 to 28-JUN-2024.
Road work begins
CRD 366 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CRD OLD 50 E East
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-MAR-2024 to 30-APR-2024.
Road work begins
CRD N OUTER RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
CRD OLD 50 W West
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-MAR-2024 to 30-APR-2024.
Road work begins
RT A S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route MO 100 E East
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins
US 50 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 133 S South
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 10-MAY-2024.
Road work begins
.029 MILE(S) BEFORE PVT PRIVATE RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT A N North
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-MAR-2024 to 30-APR-2024.
Road work begins
.057 MILE(S) AFTER US 50 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT A S South
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-MAR-2024 to 30-APR-2024.
Road work begins
CRD MAIN ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT EE N North
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 10-MAY-2024.
Road work begins
MO 133 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT EE S South
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 10-MAY-2024.
Road work begins
CRD 505 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 28 W West
-
OSAGE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2024 to 25-APR-2024.
Road work begins
.007 MILE(S) BEFORE CST FIRST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT AA S South
-
OSAGE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2024 to 25-APR-2024.
Road work begins
RT T S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT E E East
-
OSAGE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 08-FEB-2024 to 03-JUN-2024.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT E W West
-
OSAGE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 08-FEB-2024 to 03-JUN-2024.
Road work begins
MO 89 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT U N North
-
OSAGE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 08-FEB-2024 to 03-JUN-2024.
Road work begins
.629 MILE(S) BEFORE RT DD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT U S South
-
OSAGE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 08-FEB-2024 to 03-JUN-2024.
Road work begins
.032 MILE(S) AFTER US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Interstate IS 155 N North
-
PEMISCOT COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 17-APR-2024 to 19-APR-2024.
Road work begins
US 412 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 51 S South
-
PERRY COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 31-MAY-2024.
Road work begins
.014 MILE(S) AFTER CRD 704 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 44 E East
-
PHELPS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 22-FEB-2023 to 01-OCT-2024.
Road work begins
.072 MILE(S) BEFORE US 63 S.
Work will be done
7 days a week.
Interstate IS 44 W West
-
PHELPS COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 11-APR-2024 to 20-APR-2024.
Road work begins
1.981 MILE(S) AFTER RP LP44 TO IS44W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CST JAMES BLVD E East
-
PHELPS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
CST JAMES BLVD W West
-
PHELPS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
.004 MILE(S) AFTER MO 8 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT P E East
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 09-APR-2024 to 25-APR-2024.
Road work begins
RT J S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
State Route RT P W West
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 09-APR-2024 to 25-APR-2024.
Road work begins
RT T S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
State Route RT T N North
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 09-APR-2024 to 25-APR-2024.
Road work begins
RT M E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
State Route RT T S South
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 09-APR-2024 to 25-APR-2024.
Road work begins
.005 MILE(S) AFTER CST FIRST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
CST NW 72ND ST W West
-
PLATTE COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
.011 MILE(S) BEFORE OR 29 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 371 N North
-
PLATTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins
.03 MILE(S) AFTER MO 273 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 29 N North
-
PLATTE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins
.088 MILE(S) BEFORE CRD NEW MARKET RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 29 S South
-
PLATTE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins
.098 MILE(S) BEFORE CRD NEW MARKET RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 92 W West
-
PLATTE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-MAR-2024 to 01-MAY-2024.
Road work begins
.082 MILE(S) BEFORE CRD WINDMILL DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 44 W West
-
PULASKI COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-MAR-2024 to 15-MAY-2024.
Road work begins
.981 MILE(S) AFTER RP RTJ TO IS44W W.
Work will be done
7 days a week.
Interstate IS 44 W West
-
PULASKI COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-SEP-2023 to 30-APR-2024.
Road work begins
.122 MILE(S) AFTER LP 44 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
07:00 AM.
State Route MO 133 N North
-
PULASKI COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 10-MAY-2024.
Road work begins
.077 MILE(S) BEFORE CRD BLADE LN E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 17 N North
-
PULASKI COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 22-APR-2024.
Road work begins
.281 MILE(S) BEFORE OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 17 S South
-
PULASKI COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 22-APR-2024.
Road work begins
.153 MILE(S) BEFORE CST WHITTLEBURG HEIGHTS E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 3 N North
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins
.001 MILE(S) AFTER US 24 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT O S South
-
RAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2024 to 03-MAY-2024.
Road work begins
.014 MILE(S) BEFORE CRD PERRY RD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT H E East
-
REYNOLDS COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 12-APR-2024 to 03-MAY-2024.
Road work begins
MO 21 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT H W West
-
REYNOLDS COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 12-APR-2024 to 03-MAY-2024.
Road work begins
PVT PRIVATE DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT KK N North
-
REYNOLDS COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-FEB-2024 to 30-JUL-2024.
Road work begins
MO 72 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT N N North
-
REYNOLDS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road work begins
MO 72 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 202 E East
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 01-NOV-2024.
Road work begins
.084 MILE(S) BEFORE CRD AGROW AVE E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 202 W West
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 01-NOV-2024.
Road work begins
US 136 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 01-NOV-2024.
Road work begins
CRD W IA MO ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 60 W West
-
SCOTT COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-OCT-2023 to 01-JUL-2024.
Road work begins
.004 MILE(S) BEFORE IS 55 S.
Work will be done
on weekdays only.
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins
.202 MILE(S) AFTER WS IS70W FORISTELL W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CST CAVE SPRINGS RD N North
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins
.009 MILE(S) BEFORE CST VETERANS MEMORIAL PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
CST CAVE SPRINGS RD S South
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins
OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
CST TECHNOLOGY DR N North
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.029 MILE(S) BEFORE RT N E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST ZUMBEHL RD N North
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins
.002 MILE(S) AFTER OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
CST ZUMBEHL RD S South
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins
.002 MILE(S) BEFORE OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.1 MILE(S) BEFORE RT DD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.053 MILE(S) BEFORE RT N E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 project #2
SURVEYING
Scheduled from 19-APR-2024 to 26-APR-2024.
Road work begins
.205 MILE(S) BEFORE RP IS64E TO PROSPECT RD W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzvilleInterstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins
.774 MILE(S) AFTER RP RTDDS TO IS64E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 64 W West
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins
1.244 MILE(S) BEFORE RP IS64W TO RTDDS S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 64 W West
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.113 MILE(S) AFTER RP IS64W TO RTDDS S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 70 E East
-
ST. CHARLES COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins
.249 MILE(S) AFTER CST EXECUTIVE CENTRE PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Interstate IS 70 E East
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 project #2
SURVEYING
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
.031 MILE(S) BEFORE RP IS70E TO DAVID HOEKEL PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 PM
and
05:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzvilleInterstate IS 70 W West
-
ST. CHARLES COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins
.01 MILE(S) BEFORE CST CONVENTION CENTER BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 79 N North
-
ST. CHARLES COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 18-APR-2024 to 31-MAY-2024.
Road work begins
.131 MILE(S) AFTER RP SALT RIVER RD TO MO79N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 79 S South
-
ST. CHARLES COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 18-APR-2024 to 31-MAY-2024.
Road work begins
.169 MILE(S) AFTER CRD OLD MONROE RD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT D E East
-
ST. CHARLES COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.02 MILE(S) AFTER PVT COUNTRY OAKS E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT DD N North
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.002 MILE(S) BEFORE CST WINGHAVEN BLVD N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT DD S South
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
CST WINGHAVEN BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 32 E East
-
ST. FRANCOIS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 11-APR-2024 to 09-MAY-2024.
Road work begins
CST MAPLE VALLEY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route MO 32 W West
-
ST. FRANCOIS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 11-APR-2024 to 09-MAY-2024.
Road work begins
CST ST FRANCOIS AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route RT AA N North
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.003 MILE(S) BEFORE CRD THOMAS RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT AA S South
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
RT H S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT B N North
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.004 MILE(S) BEFORE CRD LOUGHBORO RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT B S South
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.002 MILE(S) BEFORE CRD LOUGHBORO RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT E N North
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
MO 47 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT E S South
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.006 MILE(S) AFTER PVT RECAR DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT EE N North
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.001 MILE(S) AFTER CRD COLONY CHURCH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT EE S South
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.004 MILE(S) AFTER CRD VALLEY FORGE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT K E East
-
ST. FRANCOIS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.007 MILE(S) BEFORE CRD CLAY ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT K W West
-
ST. FRANCOIS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.002 MILE(S) AFTER PVT RIVER VIEW LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT N N North
-
ST. FRANCOIS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.017 MILE(S) AFTER RT NN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT N S South
-
ST. FRANCOIS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.005 MILE(S) BEFORE CST AIRPORT DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT NN E East
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
RT N S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT NN W West
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
MO 221 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT O E East
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.004 MILE(S) AFTER US 67 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
State Route RT O W West
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.138 MILE(S) AFTER RT D S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
CST LADUE RD E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2024 to 22-APR-2024.
Road work begins
.024 MILE(S) BEFORE RP RTAB TO IS270W W.
Work will be done
7 days a week.
CST LADUE RD W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2024 to 22-APR-2024.
Road work begins
.023 MILE(S) BEFORE RT AB E.
Work will be done
7 days a week.
Interstate IS 170 E East
-
ST. LOUIS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 17-APR-2024 to 19-APR-2024.
Road work begins
.03 MILE(S) AFTER RR SAINT LOUIS DISTRICT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
07:00 AM.
Interstate IS 170 W West
-
ST. LOUIS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 17-APR-2024 to 19-APR-2024.
Road work begins
.106 MILE(S) BEFORE RP IS170W TO AIRPORT RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
07:00 AM.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.008 MILE(S) AFTER CST CLAYTON RD E.
Work will be done
7 days a week.
Interstate IS 270 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.026 MILE(S) AFTER RP MO340E TO IS270W W.
Work will be done
7 days a week.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 18-MAR-2024 to 26-APR-2024.
Road work begins
.527 MILE(S) AFTER RT OO S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
12:00 AM
and
12:00 PM.
Interstate IS 55 N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins
.024 MILE(S) BEFORE RP IS55N TO IS270E E.
Work will be done
7 days a week.
State Route MO 100 E East
-
ST. LOUIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 31-OCT-2024.
Road work begins
.04 MILE(S) BEFORE CST WEST COUNTY SHOP CTR DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
03:00 AM
and
01:00 PM.
State Route MO 100 W West
-
ST. LOUIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 31-OCT-2024.
Road work begins
US 67 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
03:00 AM
and
01:00 PM.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins
.036 MILE(S) BEFORE OR 340 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins
.018 MILE(S) AFTER IS 270 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 364 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAR-2024 to 31-MAY-2024.
Road work begins
.005 MILE(S) BEFORE MO 141 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
02:00 PM.
State Route MO 364 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAR-2024 to 31-MAY-2024.
Road work begins
.135 MILE(S) AFTER CRD SEVEN PINES DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
02:00 PM.
Ramp RP IS270E TO RTAB E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2024 to 22-APR-2024.
Road work begins
.006 MILE(S) AFTER IS 270 E.
Work will be done
7 days a week.
Ramp RP IS270W TO RTAB W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2024 to 22-APR-2024.
Road work begins
.009 MILE(S) AFTER IS 270 W.
Work will be done
7 days a week.
Ramp RP RTAB TO IS270E E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-APR-2024 to 31-OCT-2024.
Road work begins
RT AB E.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:05 AM
and
12:00 PM.
US US 67 N North
-
ST. LOUIS COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins
US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins
.028 MILE(S) AFTER CST CHESTER AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 19-JUN-2023 to 17-JUN-2024.
Road work begins
.142 MILE(S) AFTER RP LILAC AVE TO IS270E E.
Work will be done
7 days a week.
Work will be conducted between the hours of
12:00 AM
and
12:00 PM.
State Route MO 141 S South
-
ST. LOUIS COUNTY
- No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 04-MAR-2024 to 03-MAY-2024.
Road work begins
.018 MILE(S) BEFORE CST PRICHARD FARM RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
12:00 AM.
CST S EATHERTON RD N North
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST S EATHERTON RD S South
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST WILD HORSE CREEK RD E East
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST WILD HORSE CREEK RD W West
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 100 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins
CST RARITAN DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 100 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins
.029 MILE(S) AFTER CST INDUSTRIAL CT S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 100 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 10-APR-2024 to 19-APR-2024.
Road work begins
.03 MILE(S) BEFORE CST ANDREW DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 109 N North
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 109 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 26-APR-2024.
Road work begins
.047 MILE(S) AFTER CST MANCHESTER RD E.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 109 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 26-APR-2024.
Road work begins
.123 MILE(S) AFTER PVT PRIVATE E.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 109 S South
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 141 N North
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.009 MILE(S) BEFORE PED PO29 ON MO141 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 141 S South
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.002 MILE(S) AFTER RP MO364E TO MO141N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 180 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins
.025 MILE(S) AFTER CST WELLSTON PL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 267 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 26-APR-2024.
Road work begins
US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 267 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-APR-2024 to 26-APR-2024.
Road work begins
.033 MILE(S) BEFORE CRD NAVAJO DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins
.002 MILE(S) BEFORE CST RIVER VALLEY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP IS55S TO IS270E E East
-
ST. LOUIS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins
IS 55 S.
Work will be done
7 days a week.
Ramp RP IS64W TO BRENTWOOD BLVD N North
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins
.027 MILE(S) BEFORE CST LACLEDE STATION RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
State Route RT AC S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins
.023 MILE(S) BEFORE CST ESTATES DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route RT CC E East
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT CC W West
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT D E East
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 12-JUN-2024.
Road work begins
.049 MILE(S) BEFORE RR TRRA WEST BELT E.
Work will be done
7 days a week.
State Route RT D W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-APR-2024 to 22-APR-2024.
Road work begins
.002 MILE(S) AFTER CST PURDUE AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route RT D W West
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 12-JUN-2024.
Road work begins
.012 MILE(S) AFTER CST PURDUE AVE S.
Work will be done
7 days a week.
State Route RT N S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAR-2024 to 19-APR-2024.
Road work begins
.003 MILE(S) BEFORE CST YOUNG AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route RT U N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2024 to 10-MAY-2024.
Road work begins
.01 MILE(S) AFTER MO 115 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 61 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 23-APR-2024.
Road work begins
.026 MILE(S) BEFORE MO 21 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 61 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins
.019 MILE(S) AFTER CRD CONCORD VILLAGE AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 08-JAN-2024 to 24-APR-2024.
Road work begins
.007 MILE(S) BEFORE CRD SCHUETZ RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-FEB-2024 to 24-APR-2024.
Road work begins
.029 MILE(S) BEFORE CST NORTH TEALBROOK DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
CST COMPTON AVE N North
-
ST. LOUIS CITY
- Expect Delays
ROADSIDE WORK
Scheduled from 01-MAR-2024 to 30-APR-2024.
Road work begins
.003 MILE(S) BEFORE OR 64 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST COMPTON AVE S South
-
ST. LOUIS CITY
- Expect Delays
ROADSIDE WORK
Scheduled from 01-MAR-2024 to 30-APR-2024.
Road work begins
.001 MILE(S) AFTER CST FOREST PARK AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 44 E East
-
ST. LOUIS CITY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.035 MILE(S) AFTER RP IS44E TO WASHINGTON AVE N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Interstate IS 44 W West
-
ST. LOUIS CITY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.034 MILE(S) BEFORE RV 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 44 W West
-
ST. LOUIS CITY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-APR-2024 to 23-APR-2024.
Road work begins
.067 MILE(S) BEFORE CST SOUTHWEST AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
Interstate IS 55 N North
-
ST. LOUIS CITY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 19-APR-2024 to 08-MAY-2024.
Road work begins
.001 MILE(S) AFTER RP GASCONADE ST TO IS55N N.
Work will be done
7 days a week.
Interstate IS 55 S South
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins
.009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done
7 days a week.
Ramp RP IS64W TO FOREST PARK AVE W West
-
ST. LOUIS CITY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road work begins
IS 64 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 270 W West
-
ST. LOUIS CITY
- No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 19-JUN-2023 to 17-JUN-2024.
Road work begins
.053 MILE(S) AFTER RT H S.
Work will be done
7 days a week.
Work will be conducted between the hours of
12:00 AM
and
12:00 PM.
Interstate IS 55 N North
-
ST. LOUIS CITY
- Delays Possible
MEDIAN OR SHOULDER
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins
.049 MILE(S) BEFORE CST UTAH ST E.
Work will be done
on weekdays only.
State Route MO 100 E East
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.004 MILE(S) AFTER CST VANDEVENTER AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 100 W West
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.004 MILE(S) AFTER CST 39TH ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP HAMPTON CONCOURSE N TO IS64E E East
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins
CST HAMPTON AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP IS64E TO HAMPTON CONCOURSE N North
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-MAR-2024 to 31-MAY-2024.
Road work begins
.008 MILE(S) AFTER RP IS64E TO HAMPTON CONCOURSE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
10:00 AM.
Ramp RP IS64E TO HAMPTON CONCOURSE S South
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins
IS 64 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP IS64W TO HAMPTON CONCOURSE S South
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins
IS 64 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT B N North
-
STE. GENEVIEVE COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins
RT F E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT B S South
-
STE. GENEVIEVE COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins
MO 32 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 114 E East
-
STODDARD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 20-MAY-2024.
Road work begins
MO 25 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route MO 114 W West
-
STODDARD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 20-MAY-2024.
Road work begins
.001 MILE(S) AFTER US 60 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route MO 51 N North
-
STODDARD COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-MAR-2024 to 08-MAY-2024.
Road work begins
.004 MILE(S) AFTER CST INDUSTRIAL DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 51 S South
-
STODDARD COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-MAR-2024 to 08-MAY-2024.
Road work begins
.002 MILE(S) AFTER CST SCHUMACHER AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 114 E East
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 08-APR-2024 to 29-APR-2024.
Road work begins
CST TROTTER ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route MO 114 W West
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 08-APR-2024 to 29-APR-2024.
Road work begins
.002 MILE(S) BEFORE CRD 763 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
US US 60 W West
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 15-APR-2024 to 30-APR-2024.
Road work begins
.009 MILE(S) AFTER RT AH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 13 N North
-
STONE COUNTY
- Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 30-MAY-2024.
Road work begins
CST BLUE EYE BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route MO 13 S South
-
STONE COUNTY
- Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 30-MAY-2024.
Road work begins
.128 MILE(S) BEFORE PVT PARADISE LANDING RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route RT V E East
-
STONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins
MO 176 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 376 E East
-
TANEY COUNTY
- Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 30-MAY-2024.
Road work begins
CST SHEPHERD OF THE HILLS EXP E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route MO 376 W West
-
TANEY COUNTY
- Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 30-MAY-2024.
Road work begins
MO 265 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route MO 86 E East
-
TANEY COUNTY
- Expect Delays
Project Name -
Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins
.163 MILE(S) AFTER CRD LEISURE LN E.
Work will be done
7 days a week.
Project Web Page -
https://www.modot.org/long-creek-bridge-projectState Route MO 86 E East
-
TANEY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2024 to 01-JUL-2024.
Road work begins
.488 MILE(S) BEFORE CRD JONES RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 86 W West
-
TANEY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2024 to 01-JUL-2024.
Road work begins
US 65 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 86 W West
-
TANEY COUNTY
- Expect Delays
Project Name -
Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins
.218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done
7 days a week.
Project Web Page -
https://www.modot.org/long-creek-bridge-projectState Route MO 86 W West
-
TANEY COUNTY
- Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 30-MAY-2024.
Road work begins
US 65 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 86 E East
-
TANEY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins
.174 MILE(S) AFTER CRD LEISURE LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 86 W West
-
TANEY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins
.194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT C E East
-
WASHINGTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 11-MAR-2024 to 25-APR-2024.
Road work begins
.049 MILE(S) AFTER RT Z E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
State Route RT C W West
-
WASHINGTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 11-MAR-2024 to 25-APR-2024.
Road work begins
MO 21 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
Interstate IS 44 E East
-
WEBSTER COUNTY
- Expect Delays
Project Name -
I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2024 to 03-MAY-2024.
Road work begins
.228 MILE(S) BEFORE RP IS44E TO RTB E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Interstate IS 44 W West
-
WEBSTER COUNTY
- Expect Delays
Project Name -
I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2024 to 03-MAY-2024.
Road work begins
.216 MILE(S) BEFORE RP IS44W TO RTB N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route RT V E East
-
ANDREW COUNTY
- CLOSED
RESURFACING PAVEMENT
Scheduled from 24-APR-2024 to 30-APR-2024.
Road work begins
.007 MILE(S) AFTER US 169 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 29 N North
-
ANDREW COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.069 MILE(S) BEFORE US 59 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 29 S South
-
ANDREW COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.066 MILE(S) BEFORE CRD 369 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 71 S South
-
ANDREW COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.317 MILE(S) BEFORE CO US71N TO US71S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT MM N North
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
CRD 310 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT MM S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
MO 46 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT Y N North
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
US 136 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT Y S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
RT AA E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 151 N North
-
AUDRAIN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
CRD 116 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 151 S South
-
AUDRAIN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
CRD 128 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT D W West
-
AUDRAIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 31-MAY-2024.
Road work begins
.001 MILE(S) AFTER MO 22 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route RT M S South
-
AUDRAIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 30-APR-2024.
Road work begins
RT FF E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
Interstate IS 49 S South
-
BATES COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.079 MILE(S) BEFORE RT A E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT OO N North
-
BENTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
CRD FEASTER BRANCH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT P E East
-
BENTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
RT E S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
State Route RT P W West
-
BENTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
RT ZZ S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
State Route RT D E East
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 31-MAY-2024.
Road work begins
RT Z S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
CRD TOM BASS RD S South
-
BOONE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 10-MAY-2024.
Road work begins
OR 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 163 N North
-
BOONE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-APR-2024 to 14-AUG-2024.
Road work begins
.001 MILE(S) AFTER RT K E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 163 S South
-
BOONE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-APR-2024 to 14-AUG-2024.
Road work begins
CST PROVIDENCE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT AC E East
-
BOONE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2024 to 26-APR-2024.
Road work begins
.012 MILE(S) AFTER CST BUTTONWOOD DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 PM
and
06:30 AM.
State Route RT KK E East
-
BOONE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
.031 MILE(S) BEFORE CRD SOUTHERN HILLS DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT KK W West
-
BOONE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
CRD OLD MILLCREEK RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT U E East
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins
CRD DAY SW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT U W West
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins
.007 MILE(S) AFTER RR UP S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 60 E East
-
BUTLER COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.489 MILE(S) BEFORE RR DESOTO SUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
US US 67 N North
-
BUTLER COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.004 MILE(S) BEFORE BU 67 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT M N North
-
CALLAWAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 30-APR-2024.
Road work begins
.006 MILE(S) AFTER RT E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route RT B E East
-
CALLAWAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
RT E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Ramp RP IS49S TO MO2E E East
-
CASS COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.003 MILE(S) AFTER IS 49 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
11:00 AM.
Interstate IS 49 S South
-
CASS COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.012 MILE(S) BEFORE RP IS49S TO MO2E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
11:00 AM.
State Route RT W W West
-
CASS COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.024 MILE(S) AFTER CRD 307TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 58 E East
-
CASS COUNTY
- No Delays Expected
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.034 MILE(S) BEFORE CRD PECULIAR DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
CRD 195TH ST E East
-
CASS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.006 MILE(S) BEFORE IS 49 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
08:30 PM.
CRD 195TH ST W West
-
CASS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.009 MILE(S) AFTER CST CITY OF RAYMORE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
08:30 PM.
State Route MO 2 E East
-
CASS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 21-APR-2024 to 26-APR-2024.
Road work begins
.043 MILE(S) AFTER CRD ORCHARD RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT C E East
-
CHARITON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.004 MILE(S) AFTER CRD SILOAM AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT C W West
-
CHARITON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.004 MILE(S) BEFORE CRD SAINT JOSEPH AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT PP E East
-
CHARITON COUNTY
- CLOSED
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.023 MILE(S) BEFORE CRD CEMETERY AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
State Route RT PP W West
-
CHARITON COUNTY
- CLOSED
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.518 MILE(S) BEFORE CRD SALT LICK AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
State Route MO 11 N North
-
CHARITON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
US 24 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 11 S South
-
CHARITON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
.002 MILE(S) AFTER RT CC S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT KK N North
-
CHARITON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
MO 5 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT KK S South
-
CHARITON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.598 MILE(S) BEFORE CRD OLD CHARITON RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 06-JUL-2024.
Road work begins
.046 MILE(S) AFTER CST VANILLA BEAN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 14 W West
-
CHRISTIAN COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 06-JUL-2024.
Road work begins
RT PP S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT PP S South
-
CHRISTIAN COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 06-JUL-2024.
Road work begins
MO 14 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 435 S South
-
CLAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.01 MILE(S) BEFORE CST NE BIRMINGHAM RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
04:00 PM.
Business BU 50 E East
-
COLE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 24-MAY-2024.
Road work begins
.131 MILE(S) BEFORE CST STONERIDGE PKWY S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT B N North
-
COLE COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.075 MILE(S) BEFORE PVT VOLMERT LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT B S South
-
COLE COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.08 MILE(S) BEFORE CST BOB WHITE LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT EE N North
-
DEKALB COUNTY
- Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
US 69 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
02:30 PM.
State Route RT EE S South
-
DEKALB COUNTY
- Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
MO 6 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
02:30 PM.
State Route RT K S South
-
DENT COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.113 MILE(S) BEFORE RT E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT ZZ E East
-
DUNKLIN COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.005 MILE(S) BEFORE CRD 721 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
State Route RT ZZ W West
-
DUNKLIN COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.007 MILE(S) AFTER RT NN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
CST ST LOUIS ST E East
-
GREENE COUNTY
- CLOSED
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 29-APR-2024.
Road work begins
.003 MILE(S) BEFORE BU 65 S.
Work will be done
7 days a week.
CST ST LOUIS ST W West
-
GREENE COUNTY
- CLOSED
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 29-APR-2024.
Road work begins
BU 65 S.
Work will be done
7 days a week.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 17-MAY-2024.
Road work begins
.004 MILE(S) AFTER CRD 194 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 17-MAY-2024.
Road work begins
.004 MILE(S) BEFORE CRD 194 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 17-MAY-2024.
Road work begins
.245 MILE(S) AFTER CST ILLINOIS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT V S South
-
GRUNDY COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 14-MAY-2024.
Road work begins
.068 MILE(S) AFTER MO 6 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT AA E East
-
HARRISON COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.274 MILE(S) AFTER CRD W 200 AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 7 N North
-
HENRY COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
.137 MILE(S) BEFORE CST MO7N TO CST GAINES DR N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 7 S South
-
HENRY COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
.182 MILE(S) AFTER CST WATER ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT C E East
-
HOLT COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
RT N S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
State Route RT C W West
-
HOLT COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.009 MILE(S) AFTER RT DD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
State Route RT P N North
-
HOLT COUNTY
- CLOSED
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.02 MILE(S) BEFORE CST MINTON E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT P S South
-
HOLT COUNTY
- CLOSED
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.075 MILE(S) BEFORE RR ST JOSEPH SUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT P N North
-
HOLT COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
CRD 220 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
12:00 PM.
State Route RT AA E East
-
HOWARD COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
MO 87 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT AA W West
-
HOWARD COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
RT E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT E E East
-
HOWARD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.007 MILE(S) AFTER CRD 317 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT E W West
-
HOWARD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.006 MILE(S) AFTER MO 87 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
US US 40 E East
-
HOWARD COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins
.035 MILE(S) BEFORE PVT 445 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 40 W West
-
HOWARD COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins
.016 MILE(S) AFTER CRD 439 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS35S TO IS35S S South
-
JACKSON COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
IS 35 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Ramp RP US169N TO IS35S S South
-
JACKSON COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.008 MILE(S) AFTER US 169 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 350 W West
-
JACKSON COUNTY
- No Delays Expected
ROADSIDE WORK
Scheduled from 22-APR-2024 to 27-APR-2024.
Road work begins
.388 MILE(S) AFTER CST BLUE PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST KELLEY RD N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.025 MILE(S) BEFORE OR 150 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST KELLEY RD S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.155 MILE(S) BEFORE MO 150 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 150 E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.181 MILE(S) BEFORE CST KELLEY RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 150 W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.207 MILE(S) BEFORE CST KELLEY RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.119 MILE(S) AFTER RT HH E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.246 MILE(S) AFTER RP CEDAR RD TO IS49N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.165 MILE(S) BEFORE CST ROBERT ELLIS YOUNG DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
1.013 MILE(S) AFTER RP RTD TO IS49N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.045 MILE(S) BEFORE RP IS49N TO CIVIL WAR RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.353 MILE(S) BEFORE CST JACKPINE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.02 MILE(S) AFTER CST OAK ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.064 MILE(S) AFTER RP CIVIL WAR RD TO IS49N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.186 MILE(S) BEFORE RP IS49S TO MO96 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.943 MILE(S) AFTER MO 571 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.912 MILE(S) AFTER RP RTM TO IS49S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
1.31 MILE(S) AFTER CST NUTMEG RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.192 MILE(S) BEFORE RT D E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.249 MILE(S) BEFORE CRD JACKPINE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.208 MILE(S) AFTER RP MO96 TO IS49S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.054 MILE(S) AFTER RP IS49S TO CST W FAIRVIEW AVE W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 171 S South
-
JASPER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-APR-2024 to 02-MAY-2024.
Road work begins
.157 MILE(S) BEFORE OR 171 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Ramp RP IS55S TO US67S S South
-
JEFFERSON COUNTY
- CLOSED
PAVEMENT MARKING
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
IS 55 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
State Route RT Y N North
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.212 MILE(S) AFTER PVT ROUSAN LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CRD DANBY RD E East
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.008 MILE(S) BEFORE IS 55 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
CRD DANBY RD W West
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.007 MILE(S) BEFORE IS 55 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
Interstate IS 55 S South
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 24-APR-2024 to 27-APR-2024.
Road work begins
.18 MILE(S) AFTER RT TT S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
Outer Road W OR 55 S South
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
.169 MILE(S) AFTER RT TT S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route RT B N North
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.071 MILE(S) AFTER RT C S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
09:00 PM.
State Route RT B S South
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.118 MILE(S) AFTER CRD KLONDIKE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
09:00 PM.
State Route RT TT N North
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.027 MILE(S) BEFORE IS 55 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route RT TT S South
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.013 MILE(S) AFTER OR 55 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 13 N North
-
JOHNSON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.001 MILE(S) BEFORE CRD 850 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 13 S South
-
JOHNSON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.017 MILE(S) BEFORE CRD 600 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT K E East
-
KNOX COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 24-APR-2024.
Road work begins
RT EE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT K E East
-
KNOX COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
CRD ELK RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT K W West
-
KNOX COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 24-APR-2024.
Road work begins
.002 MILE(S) AFTER CRD EAGLE AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT K E East
-
KNOX COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 01-NOV-2024.
Road work begins
.002 MILE(S) AFTER MO 15 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 6 E East
-
KNOX COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.062 MILE(S) AFTER CST LAFAYETTE ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 6 W West
-
KNOX COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.389 MILE(S) BEFORE RT T E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT K W West
-
KNOX COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
CRD ELKHART PL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT A N North
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.01 MILE(S) BEFORE RT W E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
04:30 PM.
State Route RT J W West
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.003 MILE(S) AFTER CRD ATHENS RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT O W West
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
.01 MILE(S) AFTER RT AF S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
State Route RT T N North
-
LAFAYETTE COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.004 MILE(S) BEFORE CRD SHELBY RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT T S South
-
LAFAYETTE COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.001 MILE(S) BEFORE PVT MARIES CREEK BLVD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT T N North
-
LAFAYETTE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.072 MILE(S) BEFORE CST 26TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT T N North
-
LAFAYETTE COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.207 MILE(S) BEFORE CRD HAYGOOD RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
State Route RT T S South
-
LAFAYETTE COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.105 MILE(S) BEFORE CRD HAYGOOD RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
State Route RT T S South
-
LAFAYETTE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.073 MILE(S) BEFORE CST EASTWOOD AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 24 E East
-
LAFAYETTE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.002 MILE(S) BEFORE CST PINE ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
US US 24 W West
-
LAFAYETTE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.001 MILE(S) BEFORE CST BLUFF ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
US US 60 E East
-
LAWRENCE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 17-MAY-2024.
Road work begins
.005 MILE(S) AFTER CST WESTERN AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT K W West
-
LEWIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 01-NOV-2024.
Road work begins
.001 MILE(S) AFTER MO 6 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT E W West
-
LINCOLN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 15-JUN-2024.
Road work begins
.015 MILE(S) BEFORE CST WILLIAMS ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT Y N North
-
LINN COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
.003 MILE(S) BEFORE CRD DART RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT Y S South
-
LINN COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
CRD BASKER RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
US US 36 W West
-
LINN COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.775 MILE(S) AFTER MO 130 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
02:30 PM.
State Route RT D N North
-
LIVINGSTON COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road work begins
.159 MILE(S) AFTER CRD 420 E.
Work will be done
7 days a week.
State Route RT D S South
-
LIVINGSTON COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road work begins
.065 MILE(S) BEFORE CRD 418 S.
Work will be done
7 days a week.
State Route RT V N North
-
LIVINGSTON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 14-MAY-2024.
Road work begins
US 65 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT VV N North
-
MACON COUNTY
- CLOSED
BRIDGE INSPECTION
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.011 MILE(S) BEFORE CRD BISON ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT VV S South
-
MACON COUNTY
- CLOSED
BRIDGE INSPECTION
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.169 MILE(S) BEFORE CRD ARCTIC RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT F N North
-
MACON COUNTY
- Delays Possible
SEAL COAT OVERLAY
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.598 MILE(S) BEFORE CRD DESOTO PL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT F S South
-
MACON COUNTY
- Delays Possible
SEAL COAT OVERLAY
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.001 MILE(S) BEFORE CRD DESOTO PL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT E E East
-
MARIES COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
MO 28 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT E W West
-
MARIES COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
CRD 511 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
US US 36 W West
-
MARION COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
RT U S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
05:00 AM
and
06:00 PM.
State Route MO 43 N North
-
MCDONALD COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.021 MILE(S) AFTER MO 90 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 43 S South
-
MCDONALD COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.022 MILE(S) BEFORE RT O E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT E E East
-
MERCER COUNTY
- CLOSED
SURVEYING
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins
.008 MILE(S) BEFORE CRD KEYSTONE AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 AM
and
04:00 PM.
State Route RT U E East
-
MONROE COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 30-APR-2024.
Road work begins
CRD 450 SPUR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT U E East
-
MONROE COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.001 MILE(S) BEFORE CRD 455 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT U W West
-
MONROE COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 30-APR-2024.
Road work begins
.001 MILE(S) BEFORE CRD 436 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT U W West
-
MONROE COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
CRD 465 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT K E East
-
MONTGOMERY COUNTY
- CLOSED
CORE DRILLING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.001 MILE(S) AFTER RT P S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT K W West
-
MONTGOMERY COUNTY
- CLOSED
CORE DRILLING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
MO 19 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT E E East
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 15-JUN-2024.
Road work begins
RT Y E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT K E East
-
NEWTON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.754 MILE(S) BEFORE CRD BLUEBIRD DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT K W West
-
NEWTON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.005 MILE(S) AFTER RR CHEROKEE SUB E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT A W West
-
NODAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
.274 MILE(S) BEFORE CST ELM ST E.
Work will be done
on weekdays only.
State Route RT Z E East
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 03-JUN-2024.
Road work begins
CRD 274-B E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT Z W West
-
OSAGE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 03-JUN-2024.
Road work begins
MO 100 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT A E East
-
PEMISCOT COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.013 MILE(S) AFTER US 412 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT A W West
-
PEMISCOT COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.02 MILE(S) AFTER CRD 286 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT J E East
-
PEMISCOT COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
.238 MILE(S) BEFORE CRD 421 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
US US 50 E East
-
PETTIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 25-APR-2024.
Road work begins
.133 MILE(S) AFTER CO US50W T0 US50E S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT AC N North
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.3 MILE(S) AFTER CRD 425 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT AC S South
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.232 MILE(S) AFTER CRD 424 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT H E East
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.936 MILE(S) BEFORE CRD 222 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT H W West
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.066 MILE(S) AFTER RT W S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT M N North
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.327 MILE(S) AFTER CRD 470 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:59 AM
and
06:00 PM.
State Route RT M S South
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.275 MILE(S) AFTER RT V E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:59 AM
and
06:00 PM.
State Route RT V E East
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.23 MILE(S) AFTER CRD 449 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT V W West
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.429 MILE(S) BEFORE CRD 449 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W N North
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.402 MILE(S) BEFORE CRD 295 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W N North
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.105 MILE(S) BEFORE CRD 219 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W S South
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.019 MILE(S) AFTER CRD 219 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W S South
-
PIKE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins
.438 MILE(S) AFTER CRD 223 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Ramp RP RTDE TO IS435S S South
-
PLATTE COUNTY
- CLOSED
PERMIT OR UTILITY WORK
Scheduled from 21-APR-2024 to 21-APR-2024.
Road work begins
.008 MILE(S) AFTER RT D E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
07:00 AM
and
07:30 AM.
Interstate IS 435 N North
-
PLATTE COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 21-APR-2024 to 21-APR-2024.
Road work begins
.179 MILE(S) AFTER RP RTC TO IS435N N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
07:00 AM
and
07:30 AM.
Interstate IS 435 S South
-
PLATTE COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 21-APR-2024 to 21-APR-2024.
Road work begins
.056 MILE(S) AFTER RP IS435S TO RTD S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
07:00 AM
and
07:30 AM.
State Route RT N E East
-
POLK COUNTY
- CLOSED
CORE DRILLING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.009 MILE(S) BEFORE CRD 7TH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 215 N North
-
POLK COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.022 MILE(S) AFTER RT JJ S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 215 S South
-
POLK COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.031 MILE(S) AFTER CRD 77TH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 44 E East
-
PULASKI COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
1.154 MILE(S) BEFORE CRD TROPHY LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 44 E East
-
PULASKI COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.131 MILE(S) BEFORE CRD SUPERIOR RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 44 W West
-
PULASKI COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.995 MILE(S) AFTER CRD TROPHY LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 44 W West
-
PULASKI COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.019 MILE(S) BEFORE CRD SUPERIOR RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 133 N North
-
PULASKI COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
.012 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 133 S South
-
PULASKI COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
.026 MILE(S) BEFORE CRD CHEYENNE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
US US 36 E East
-
RALLS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.003 MILE(S) BEFORE RT J S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
05:00 AM
and
06:00 PM.
State Route MO 72 E East
-
REYNOLDS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins
.014 MILE(S) BEFORE CRD 354 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
05:00 AM
and
05:00 PM.
State Route MO 72 W West
-
REYNOLDS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins
.001 MILE(S) AFTER CRD PARKS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
05:00 AM
and
05:00 PM.
State Route RT W E East
-
SCHUYLER COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
CRD HOOT OWL TRL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT W W West
-
SCHUYLER COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.001 MILE(S) BEFORE CST WABASH ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT EE E East
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 26-APR-2024 to 29-APR-2024.
Road work begins
MO 15 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT EE W West
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 26-APR-2024 to 29-APR-2024.
Road work begins
.001 MILE(S) AFTER CRD 817 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT H E East
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
RT N E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT H E East
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 26-APR-2024 to 26-APR-2024.
Road work begins
MO 15 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT H E East
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
CRD 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT H E East
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.001 MILE(S) BEFORE CRD 803 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT H W West
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.001 MILE(S) BEFORE CRD 716 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT H W West
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins
CRD 708 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT H W West
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
CRD 460 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT H W West
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 26-APR-2024 to 26-APR-2024.
Road work begins
CRD 819 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT RA N North
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
CRD 116 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT RA S South
-
SCOTLAND COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.001 MILE(S) AFTER RT U E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT CC N North
-
SCOTT COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
MO 91 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT CC S South
-
SCOTT COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
RT W E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
Interstate IS 55 N North
-
SCOTT COUNTY
- Expect Delays
MICROSURFACING
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins
.125 MILE(S) BEFORE RP IS57N TO IS55N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
05:00 AM
and
05:00 PM.
State Route RT K S South
-
SHANNON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
2.872 MILE(S) BEFORE CRD 359 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
Ramp RP US61S TO US40W W West
-
ST. CHARLES COUNTY
- No Delays Expected
Project Name -
Improve I-70 project #2
SURVEYING
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.023 MILE(S) AFTER US 61 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzvilleInterstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.024 MILE(S) BEFORE RP PROSPECT RD TO IS64E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT B E East
-
ST. CLAIR COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
1.108 MILE(S) BEFORE CRD NE OLD 13 HWY S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT B W West
-
ST. CLAIR COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.594 MILE(S) AFTER CRD NE OLD 13 HWY S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT O E East
-
ST. FRANCOIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins
.024 MILE(S) BEFORE CST JEFFERSON AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT O W West
-
ST. FRANCOIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins
.026 MILE(S) BEFORE CST JEFFERSON AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 231 S South
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 16-MAY-2024.
Road work begins
.006 MILE(S) BEFORE CRD OLD TELEGRAPH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
Interstate IS 270 W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE FLUSHING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.001 MILE(S) AFTER RP IS44W TO IS270W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.949 MILE(S) BEFORE RP IS44E TO MO141N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.016 MILE(S) BEFORE RP IS44E TO IS270E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
12:00 PM
and
03:00 PM.
Interstate IS 44 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.002 MILE(S) BEFORE MO 141 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Interstate IS 44 W West
-
ST. LOUIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.001 MILE(S) BEFORE US 61 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
12:00 PM.
Interstate IS 70 E East
-
ST. LOUIS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 30-JUN-2024.
Road work begins
.005 MILE(S) AFTER IS 270 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 70 W West
-
ST. LOUIS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 30-JUN-2024.
Road work begins
.096 MILE(S) BEFORE CST SPRINGDALE AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
State Route MO 267 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.021 MILE(S) BEFORE CRD TELEGRAPH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 267 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.011 MILE(S) BEFORE CRD HOFFMEISTER AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins
.023 MILE(S) BEFORE CST TROWBRIDGE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 64 E East
-
ST. LOUIS CITY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2024 to 26-APR-2024.
Road work begins
.183 MILE(S) BEFORE PED SCIENCE OVERPASS S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
Interstate IS 55 N North
-
STE. GENEVIEVE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 24-APR-2024 to 27-APR-2024.
Road work begins
.249 MILE(S) BEFORE RT TT S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
Outer Road W OR 55 N North
-
STE. GENEVIEVE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
.241 MILE(S) BEFORE RT TT S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
CRD 589 N North
-
STODDARD COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
US 60 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CRD 589 S South
-
STODDARD COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.024 MILE(S) AFTER CRD 538 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT E E East
-
STODDARD COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
MO 25 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT E W West
-
STODDARD COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
.006 MILE(S) AFTER CRD 527 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT A E East
-
STONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.026 MILE(S) BEFORE RT AA S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT A W West
-
STONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.028 MILE(S) BEFORE RT AA S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT E W West
-
SULLIVAN COUNTY
- CLOSED
SURVEYING
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins
.001 MILE(S) AFTER CRD AZALEA DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 AM
and
04:00 PM.
State Route RT BB N North
-
VERNON COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.008 MILE(S) AFTER CRD PARADE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT BB S South
-
VERNON COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.022 MILE(S) AFTER CST SOUTH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT DD E East
-
VERNON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.013 MILE(S) BEFORE CRD 2500 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT DD W West
-
VERNON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
RT B E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT E E East
-
VERNON COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.085 MILE(S) AFTER CRD 2625 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT E W West
-
VERNON COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins
.908 MILE(S) BEFORE CRD 2625 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
VERNON COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.068 MILE(S) BEFORE RP RTB TO IS49N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP IS44E TO RTB E East
-
WEBSTER COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.019 MILE(S) AFTER IS 44 E.
Work will be done
on weekdays only.
Ramp RP IS44W TO RTB N North
-
WEBSTER COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.039 MILE(S) AFTER IS 44 W.
Work will be done
on weekdays only.
Ramp RP RTB TO IS44E E East
-
WEBSTER COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
RT B S.
Work will be done
on weekdays only.
Ramp RP RTB TO IS44W W West
-
WEBSTER COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
RT B S.
Work will be done
on weekdays only.